Welcome to Carldora

  1. >
  2. Institutional

Ever since we were founded, we at Carldora have believed that innovation is the key to success. Throughout almost 50 years of existence, we have been guided by solid principles of ethics, transparency, mutual trust, professionalism and respect for all our employees, suppliers, customers, government institutions and the environment. Our mission has been to supply products of the highest quality, functionality, versatility and versatility, exceeding our customers' expectations and guaranteeing high standards of quality and complete satisfaction.

We are constantly exploring new technologies and manufacturing methods that allow us to offer increasingly efficient and safe solutions. Our team of specialists is dedicated to ensuring that every product manufactured not only fulfils but exceeds market expectations. Our confidence in the future remains solid, driven by a new dynamism and spirit of innovation, which has led us to expand our Technical Engineering and Assembly Assistance Office, to value the skills of our professionals and to promote their ideas and initiatives. In this way, we continue to offer the best and most innovative solutions to our customers.

It is with this confidence and commitment that we face new challenges, ready to continue turning our clients' projects into reality and building a better future for everyone.

Our story

1976
1976

Foundation of Carldora Import Export, LDA. A pioneer in Portugal in the design and manufacture of metal formwork, scaffolding and shoring.
Learning about the needs of construction sites and their construction processes has evolved with the monitoring of the application of products directly on site (assembly and disassembly), and particular attention to international markets.

1979
1979

Manufacturing began with scaffolding in 1979, in a garage, and as knowledge was acquired, new products were developed and manufactured. At the same time and as a GREAT SCHOOL with minimal use of bricks and plasters, the factory facilities were built in exposed reinforced concrete, with a current covered area of more than 10,000m².

1981
1981

Start of the automation with the acquisition of new automatic cutting and stamping machines for steel tubes and plates.

1983
1983

Inspired by the famous toy LEGO and with perseverance and a love of what we do, in 1983 we put together the basis of an unprecedented multi-purpose formwork system, capable of shuttering anything, which deserved to be honoured with the Invention Patent Registration No. 76533, by INPP.

1989
1989

At the same time, manufacturing systems evolved, with the acquisition in 1989 of the first welding robot. Today Carldora is pleased to have achieved the privilege of autonomous manufacture from raw materials.

1995
1995

Implementation and development of technical office engineering centre where 2D and 3D solutions are studied and presented for all types of civil and public works.

1996
1996

Patent Registration of the multi-purpose metal formwork system for pillars, beams, slabs and walls. Nº 76 533

2001
2001

Change of company name and legal personality: Carldora - Formwork, Scaffolding and Bracing, S.A, and increase the share capital to €2,500,000.00.

Patent registration for a head for shoring elements. Nº 102 272

2002
2002

Duplication of Carldora's production capacity.

2006
2006

Patent Registration Guardrail fixing part. Nº 103 237

2007
2007

Setting up a subsidiary in Angola CARLANGOLA

2008
2008

Expansion of technical office

2011
2011

Setting up a subsidiary CARLDORA Mozambique

2012
2012

Obtained Integrated Management System certification in accordance with the following standards NP ISO 9001 (Quality Management System) and EN 12810 (Industrial product CARL Scaffolding 04 MD).

2013
2013

System implementation Solidworks Patent Registration No. 11943 of the Self-climbing Formwork System for the execution of hollow vertical concrete structures.

2018
2018

Obtained Integrated Management System certification in accordance with the following standards NP ISO 14001 (Environmental Management System) and EN 45001 (Occupational Health and Safety Management System) and Conquering the Asian market.

2019
2019

First export to Oceania.

2020
2020

Utility Model Registration of the Industrial System for the Construction of Monoblock Concrete Houses. Nº 11 334

Utility Model Registration of the Formwork System for the Execution of Vertical Hollow Reinforced Concrete Structures. Nº 11 884

2026
2026

New extension project new galvanising line and technological innovation in production equipment.

Organisational chart

Mission

Providing the best solutions always under the concept that our success is a direct consequence of our Client's satisfaction.

Vision

Permanently striving to be maximally professional. There should be no situation for which we have no effective solution.

Values

Our persistence in keeping our maxims alive: Quality, Originality, Versatility. Always doing our best with ethics, rigour and competence is reflected in sustained development with monetary values that satisfy our ambition.

Careers

If you would like to join the Carldora team, send us your details and CV, indicating the category you are applying for on the form.

Application form

Category applied for
No files selectedAccepted files: .pdf, .doc, .docx. Maximum file size: 3 MB
Use the button below to attach your CV and a covering letter

13 + 5 =