Success stories

  1. >
  2. Success stories

Short introductory text to the content of this page with articles from success stories

Other success stories

Victor Moura da Silva

The motorway linking Marrakech to Agadir in Morocco crosses the Atlas Mountains, an important geographical limitation that has led to major works being carried out, one of them being the...

Read More

Engineer Pedro Ferreira

The crossing difficulties imposed by the lack of a bridge over the Limpopo River in the town of Guijá-Chókwè were hampering the development of this region. The bridge over the Limpopo River is strategic...

Read More

Nabil Safir

In 2018, engineer Nabil Safir contacted Carldora with a request for a metal formwork capable of carrying out two different projects with the greatest possible reuse of equipment. The main idea was for the same formwork to be able to carry out a WWTP...

Read More

Antoine Thaury, Gregory Elineau, Fabien Jaouen

In 2021 we were invited to develop solutions for the remodelling project of the Port of La Turballe in France, through our valued client Charier Génie Civil. The project involved formwork for the prefabrication of X blocks, concreting platforms, a...

Read More

Matthieu Carry

The MT103 project involves the construction of the interconnection with Saint-Jean-de-Maurienne between the future Mont Cenis base tunnel of the Lyon-Turin railway line and the existing railway network.Carldora is involved in this project thanks to the work of our client...

Read More

Follow our journey. Subscribe to our newsletter

Submit your details and subscribe to our newsletter. Receive first-hand information on the projects, solutions and causes we embrace, which transform us as a company made up of people.